Blocks 2.3 and 2.6 in the residential area “Sunny”.
Each block is an independent finished composition and fits perfectly into the overall structure of the building. Stylish facades and a modern look. Closed courtyards without cars are filled with greenery and cozy recreation areas.
A number of architectural families were developed for the project team of the facility, which allowed to accelerate the introduction of attribute information into the specifications of the BIM model. The peculiarity of the project was the method of facade modeling, in which the necessary values for the working documentation were obtained at an earlier stage of design.
At the request of the Customer, the calculated parameters of reinforcement of reinforced concrete structures were recorded in copies of the model elements. Thus, the Customer optimized the time spent on creating a BIM model, which allowed him to start the construction phase earlier.
During the modeling of the building elements, inconsistencies in the received source documentation were identified and taken into account. This made it possible to make the right decisions even before the start of the construction process. The models were developed on a single server with the ability to literally see the design process of each of the working groups of the object.